Case Studies

Mobile Dust Collector

Project Case Studies

2021-10-14T11:00:54+10:00

City Rail Link Project

City Rail Link (CRL) is Auckland’s first underground rail line and the largest transport infrastructure project ever undertaken in New Zealand. CRL will transform the downtown Britomart Transport Centre into a two-way through-station, doubling the capacity, reducing travel times and supporting a growing population with a world-class transit system.

2021-10-13T09:16:25+10:00

Melbourne Metro Tunnel Project

The Metro Tunnel provided some unique challenges for the ventilation design, including space and noise constraints plus the location on excavation works within the CBD. The design was created using Ventsim Design 5 to simulate ventilation, airflows, pressures, heat, gases, radon, fire and other key ventilation data to be considered, along with managing the financial constraints of the project.

Fixed Unit Dust Collector

Project Case Studies

2020-05-07T14:33:38+10:00

Bulk Storage Facility

Our client has two 8000m2 sheds that store zinc and copper concentrate before being distributed to customers across the globe. Zinc and Copper dust needed to be fully contained within each shed to protect against spillage, avoid cross contamination and ensure environmental security. With the added challenge of having the port directly opposite Townsville, EHP limits placed on the client meant no visible dust was allowed to escape each building. Grydale were commissioned to design, manufacture and install a JMS 48 F-Series Dust Collection System for each storage shed (zinc and copper) to manage dust created through loading and unloading product.

2020-05-07T18:27:58+10:00

Crushing Plant Dust Extraction System

Our clients’ site expansion works, included a tender for a dust extraction system to manage dust created by two secondary and tertiary cone crushers and three screening plants. Grydale were awarded the contract to design, manufacture and install a Grydale JMS 48 F-Series Dust Extraction System. This unit provided 38,000m3/hr of air flow at -2.0kPA, which offered the capacity to extract dust from the two secondary and tertiary cone crushers and three screening plants.

2020-05-07T18:28:42+10:00

Bulk Storage Shed Loading Facility

Our client has two 8000m2 sheds that store zinc and copper concentrate before being distributed to customers across the globe. Zinc and Copper dust needed to be fully contained within each shed to protect against spillage, avoid cross contamination and ensure environmental security. Grydale were commissioned to design, manufacture and install a JMS 48 F-Series Dust Collection System for each storage shed (zinc and copper) to manage dust created through loading and unloading product.

The Industries We Work In

We work with Project Authorities, Head Contractors and Sub Contractors to provide clean air solutions to the following industries:

TUNNELLING

MINING

EXCAVATION

ABRASIVE BLASTING

CIVIL CONSTRUCTION

BULK STORAGE HANDLING

DEMOLITION AND RECYCLING

MANUFACTURING