Client Bra [...]

Dust Control at Olympic Dam for Mine Shutdown Works
Wendy Warskitt2023-10-18T10:11:49+10:00The Olympic Dam Mine, owned by BHP, is a large poly-metallic underground mine located in Roxby Downs, South Australia. It is the fourth largest copper deposit and the largest known single deposit of uranium in the world.
Dust Control during Urban Development
Wendy Warskitt2023-10-11T12:01:55+10:00The rental of the JMS-20-MDT and JMS-30-MDT allowed our client to increase excavation speeds, saving valuable time and money while protecting the health and safety of workers and travellers on the adjacent highway.
Dust Control during Ship Unloading
Wendy Warskitt2023-10-11T11:41:29+10:00Petcoke is transported into Gladstone by ship and unloaded from the shipping hull into storage containers using the "Grab" method.
Dust Control during Ship Loading
Wendy Warskitt2023-10-11T11:36:52+10:00The correct dust control solution can increase conveyor speeds, reduce loading times, reduce port charges and labour costs while protecting the health and safety of workers and nearby communities
Sydney Metro-Central Walk
Wendy Warskitt2023-09-04T10:28:43+10:00Grydale’s in-house engineering team completed ventilation system design modeling for Laing O’Rourke to determine the ventilation and dust control requirements for the development of Central Walk...
Bulk Storage Handling
Wendy Warskitt2022-07-11T13:57:13+10:00Grydale was commissioned to design, manufacture and install a JMS 48 F-Series dust collection system for each storage shed to manage dust created through loading and unloading the zinc and copper product.
Breedon Quarry Project
Wendy Warskitt2022-07-11T13:36:28+10:00When rock excavation specialists AJ Gammond was approached to work at Breedon Quarry, Managing Director, Bruce Gammond was aware of the challenges that would be faced regarding dust control.
City Rail Link Project
Wendy Warskitt2023-09-04T10:28:33+10:00City Rail Link (CRL) is Auckland’s first underground rail line and the largest transport infrastructure project ever undertaken in New Zealand...
Coastal Powder Coating & Blasting
Wendy Warskitt2022-07-11T14:01:57+10:00Sandblasting require a custom dust control solution to handle the large volumes of toxic dust, which, if inhaled, can be hazardous to workers
Tunneling Ventilation Design
Wendy Warskitt2023-01-24T07:48:35+10:00Each tunnel project is unique and so is each ventilation design and dust control solution...
Melbourne Metro Tunnel Project
Wendy Warskitt2023-09-04T10:28:51+10:00The Melbourne Metro Stations will be built as trinocular caverns, where three overlapping tunnels will be mined by roadheaders to create one of the widest metro platforms in the world...
Dust Control with T1055 Trencher
Grydale2023-09-18T14:14:55+10:00Green Civil rented a JMS-20-Mobile Diesel Track dust collector from Grydale to work alongside a Vermeer Trencher to manage the dust created from trenching work in Sydney...
Greenbank Sewer Rising Main Project
Grydale2022-07-11T13:54:05+10:00In this project the trencher removed the rock and the JMS-20-Mobile Diesel Track dust collector extracted dust and exhausted clean air back to the environment.
Crushing Plant Dust Extraction System
Grydale2022-07-11T14:57:00+10:00Situated in Australia's remote, Gulf of Carpentaria, the McArthur River Mine (MRM) is a world-class zinc and lead mine and crushing plant.
Zinc Bulk Storage Shed, Bing Bong, NT, Australia
Wendy Warskitt2022-07-11T14:59:36+10:00At Glencore’s loading facility at Bing Bong, Zinc is stored in a bulk storage shed which needs to be fully contained to protect against spillage and ensure environmental security and prevent loss of valuable product.














